MLBDEMO.US
Your Subtitle text

Contractor Bid Documents


Rick Snyder - Governor, State of Michigan
Brian Calley - Lt. Governor, State of Michigan
Michele Wildman - Interim Director, Michigan Land Bank
ADR Consultants, LLC - Technical Assistance / Program Manager

Hardest Hit Funds Procurement:

Complete the below docs to become a Pre Qualified Contractor prior to bidding on work.

Pontiac:

Open Enrollment has begun. Any interested company can submit qualifications at any time. See Instructions within the RFQ documents and Good Luck!

Pontiac HHF Asbestos Survey RFQ

Pontiac HHF Abatement and Demolition RFQ




Detroit:

Open Enrollment has begun. Any interested company can submit qualifications at any time. See Instructions within the RFQ documents and Good Luck
!

Detroit HHF Asbestos Survey RFQ

Detroit HHF Abatement & Demolition RFQ



Demolition Current Bids

See new Expedited Payment Option for Detroit Demolition Work


There are (3) Current Active Bids for (291 structures in Detroit.

New Planned RFP Release Schedule by City and Program:


Detroit - 10/30/2014 - HHF 200 Houses
Detroit - 11/15/2014 - MLB 50 Houses
Pontiac - 11/3/2014 - HHF 40 Houses
 



#1- Detroit Hardest Hit Funds RFP#10232014A Due 10/31/2014 @ 2PM.  189 Houses.  Pre Qualified Contractors Only.
10/30/14 Announcement - this bid has been placed on HOLD.  Due Date extension will be issued shortly. Investigation underway for environmental compliance regarding all properties being properly abated and ready for demolition per stated scope.  Expect new information posted 10/31/2014.



Asbestos surveys for 11 properties NACM click here


This Bid requires no abatement as all properties have already been abated by others or have been determined to not contain ACM.  Work to 100% complete 60 days after NTP.






#2Detroit Hardest Hit Funds RFP#10232014B Due 10/31/2014 @ 2PM.  50 Houses.  Pre Qualified Contractors Only. 


Asbestos Surveys for RFP#10232014B:

Part 1    Part 2



#3- Detroit Hardest Hit Funds RFP#10232014C Due 10/31/2014 @2PM.  52 Houses.  Pre Qualified Contractors Only.

Asbestos Surveys for RFP#10232014C:

Part 1    Part 2    Part 3











The Section 3 Form below is provided to assist you in scoring maximum points.

Demo RFP Section 3 Form


Closed Bids:

Detroit State Land Bank Funds RFP#10102014A Due 10/17/2014 @ 2PM.  23 Houses.  Open to all who meet minimum specifications.
Asbestos Surveys for RFP#10092014A:
Part 1    Part 2    Part 3

Detroit State Land Bank Funds RFP#10092014B Due 10/17/2014 @ 2PM.  25 Houses.  Open to all who meet minimum specifications.

Asbestos Surveys for RFP#10092014B:
Part 1    Part 2    Part 3    Part 4

Detroit State Land Bank Funds RFP#10142014A Due 10/20/2014 @ 2PM.  11 Houses.  Open to all who meet minimum specifications.
10/16/2014 NOTE:  289 Reid Emergency Demolition added to RFP.
Asbestos Surveys for RFP#10142014A:
Part 1

Detroit State Land Bank Funds RFP#09292014A Due 10/7/2014 @ 2PM.  25 Houses.  No prequalification required.  Open to all who meet minimum specifications. 
Asbestos Survey Reports for RFP#09292014A:
Part 1    Part 2    Part 3    Part 4    Part 5    Part 6

Detroit Hardest Hit Funds RFP#09302014A Due 10/7/2014 @ 2PM.  34 Houses.  Prequalified Contractors only. New Demo Specs in Effect.
Asbestos Survey Reports for RFP#09302014A:
Part 1

Detroit Hardest Hit Funds RFP#10012014A Due 10/9/2014 @ 2PM. 145 Houses.  Prequalified Contractors Only.  New Demo Specs in Effect.
 Asbestos Survey Reports for RFP#10012014A:
Part 1    Part 2    Part 3    Part 4    Part 5    Part 6
Part 7    Part 8     Part 9

Detroit Hardest Hit Funds RFP#09102014A Due 9/18/2014 @ 2PM.  32 Houses.  Pre Qualified Contractors Only.
Asbestos Survey reports For RFP#09102014A:
Part 1

Detroit Hardest Hit Funds RFP#09052014A Due 9/15/2014 @ 2PM. 41 Houses.  Pre Qualified Contractors Only.  
Asbestos Survey reports For RFP#09052014A:
Part 1    Part 2    Part 3

Pontiac Hardest Hit Funds RFP#08282014A Due 9/5/2014 @ 2 PM.  23 Houses.  Pre Qualified Contractors only.
Asbestos Survey reports For RFP#08282014A:
Part 1 

Detroit Hardest Hit Funds RFP#08282014B Due 9/5/2014 @ 2PM.  27 Houses.  Pre Qualified Contractors Only.
Asbestos Survey reports For RFP#08282014B:
Part 1        Part 2

Detroit Hardest Hit Funds RFP#08292014A Due 9/5/2014 @ 2PM.  22 Houses.  Pre Qualified Contractors Only.
 Asbestos Survey reports For RFP#08292014A:
Part 1       Part 2        Part 3

Detroit State Land Bank Funds RFP#08192014A Due 8/27/2014 @ 2PM.  21 Houses.  No prequalification required.  Open to all who meet bid specs. 
Asbestos Survey reports for RFP#08192014A:
Part 1    Part 2    Part 3    Part 4     Part 5

Detroit State Land Bank Funds RFP#08192014B Due 8/27/2014 @ 2PM. 22 Houses.  No prequalification required.  Open to all who meet bid specs.
 Asbestos Survey reports for RFP#08192014B:
Part 1    Part 2    Part 3    Part 4    Part 5

Pontiac Hardest Hit Funds RFP#08192014C Due 8/27/2014 @ 2 PM.  20 Houses. Pre Qualified Contractors Only.
Asbestos Survey reports for RFP#08192014C:
Part 1     Part 2    Part 3

Pontiac Hardest Hit Funds RFP#08192014D Due 8/27/2014 @ 2PM.  33 Houses.  Pre Qualified Contractors Only.
 Asbestos Survey reports for RFP#08192014D:
Part 1    Part 2    Part 3    Part 4    Part 5    Part 6    Part 7

State Land Bank Funds RFP#07212014A Due 7/28/2014 @ 2PM.  12 Houses. No Prequalification required open to all who meet bid specs.
Asbestos Survey reports for RFP#07212014A:
Part 1        Part 2

State Land Bank Funds RFP#07212014B Due 7/28/2014 @ 2PM.  9 Houses.  No Prequalification required open to all who meet bid specs.
Asbestos Survey reports for RFP#07212014B:
Part 1        Part 2

Hardest Hit Funds RFP#07182014A Due 7/28/2014 @ 2PM.  21 Houses.  Pre Qualified Contractors Only.
Asbestos Survey Reports for RFP#07182014A

Hardest Hit Funds RFP#07182014B Due 7/28/2014 @ 2PM.  20 Houses.  Pre Qualified Contractors Only.
Asbestos Survey Reports for RFP#07182014B
 Copies of PSI Reports corrected from above

Hardest Hit Funds RFP#07212014C Due 7/28/2014 @ 2PM.  17 Houses.  Pre Qualified Contractors Only.
Asbestos Survey reports for RFP#07212014C:
Part 1
Part 2 16106 Fairmont Report

Hardest Hit Funds RFP#07212014D Due 7/28/2014 @ 2PM.  32 Houses.  Pre Qualified Contractors Only.
Asbestos Survey reports for RFP#07212014D:

Part 1  Part 2 Part 3 Copies of PSI Reports from Above Links.
Part 4 15313 Lappin Report Part 5

HHF Deconstruction Hardest Hit Funds RFP#06130214A Due 6/30/2014 @ 2 PM.  10 houses to be deconstructed.  Mandatory Pre Bid Meeting 6/18/2014 2:00PM 65 Cadillac Square, 39th Floor, Detroit.
Asbestos Survey Reports for RFP#06132014A:
Part 1

HHF Unit Pricing RFQ for Large Volume Demolition
Initiative.  RFQ#06172014A Due 6/19/2014 @ 2 PM.  Qualified Contractors Only.


Hardest Hit Funds RFP06022014A Due 6/10/2014 @ 2PM.  100 Houses.  Pre Qualified Contractors Only. This is a Large Scale Pilot and will be due to be completed within 30 days from NTP.
Asbestos Survey Reports for RFP#06022014A:
Part 1    Part 2    Part 3    Part 4    Part 5

 5799 Nottingham

Hardest Hit Funds RFP#05292014A Due 6/6/2014 @ 2PM.  16 Houses.  Pre Qualified Contractors Only.
Asbestos Survey Reports for RFP#05292014A:
Part 1

Hardest Hit Funds RFP#05292014B Due 6/6/2014 @ 2 PM.  18 Houses.  Pre Qualified Contractors Only.
Asbestos Survey Reports for RFP#05292014B:
Part 1

Hardest Hit Funds RFP#05292014C Due 6/6/2014 @ 2 PM.  21 Houses.  Pre Qualified Contractors Only.
Asbestos Survey Reports for RFP#05292014B:
Part 1    Part 2 PSI Surveys

Hardest Hit Funds RFP#05152014A Due 5/22/2014 @ 2PM.  28 Houses.  Pre Qualified Contractors Only.
Asbestos Survey Reports for HHF RFP#05152014A:
Part 1

Hardest Hit Funds RFP#05152014B Due 5/22/2014 @ 2 PM.  16 Houses.  Pre Qualified Contractors Only.
Asbestos Survey Reports for HHF RFP#05152014B:
Part 1    Part 2

Hardest Hit Funds RFP#05152014C Due 5/22/2014 @ 2PM.  24 Houses.  Pre Qualified Contractors Only.
Asbestos Survey Reports for HHF RFP#05152014C:
Part 1    Part 2    Part 3

Hardest Hit Funds RFP#05192014A Due 5/27/2014 @ 2PM.  16 Houses. Pre Qualified Contractors Only.
Asbestos Survey Reports for HHF RFP#05192014A:
Part 1    Part 2

Hardest Hit Funds RFP#05192014B Due 5/27/2014 @ 2PM.  18 Houses.  Pre Qualified Contractors Only.
Asbestos Survey Reports for HHF RFP#05192014B:
Part 1

Hardest Hit Funds RFP#05122014A Due 5/20/2014 @ 2PM.  17 Houses. Pre Qualified Contractors Only.
Asbestos Survey Reports for HHF RFP#05122014A:
Part 1

Hardest Hit Funds RFP#05122014B Due 5/20/2014 @ 2PM.  19 Houses.  Pre Qualified Contractors Only.
Asbestos Survey Reports for HHF RFP#05122014B:
Part 1

Hardest Hit Funds RFP#05122014C Due 5/20/2014 @ 2PM.  25 Houses.  Pre Qualified Contractors Only.
Asbestos Survey Reports for HHF RFP#05122014C:
Part 1    Part 2

Hardest Hit Funds RFP#05122014D Due 5/20/2014 @ 2PM.  20 Houses.  Pre Qualified Contractors only.
Asbestos Survey Reports for HHF RFP#05122014D:
Part 1    Part 2    Part 3

Hardest Hit Funds RFP#05082014A Due 5/15/2014 @ 2 PM.  25 Houses.  Pre Qualified Contractors Only. 
Asbestos Survey Reports for HHF RFP#05082014A:
Part 1

#2-
Hardest Hit Funds RFP#05082014B Due 5/15/2014 @ 2PM.  31 Houses.  Pre Qualified Contractors Only.
Asbestos Survey Reports for HHF RFP#05082014B:
Part 1    Part 2

Hardest Hit Funds RFP#05052014A Due 5/13/2014 @ 2PM.  22 Houses.  Pre Qualified Contractors Only.
Asbestos Survey Reports for HHF RFP#05052014A:
Part 1    Part 2  

Hardest Hit Funds RFP#05052014B Due 5/13/2014 @ 2PM.  23 Houses.  Pre Qualified Contractors Only.
Asbestos Survey Reports for HHF RFP#05052014B:
Part 1

Hardest Hit Funds RFP#05052014C Due 5/13/2014 @ 2PM.  22 Houses.  Pre Qualified Contractors Only.
Asbestos Survey Reports for HHF RFP#05052014C:
Part 1

#1-
Hardest Hit Funds RFP#04282014A Due 5/6/2014 @ 2PM.   13 Houses. Pre Qualified contractors Only.
Asbestos Survey Reports for HHF RFP#0282014A:
Part 1

#2 -
MLB DEMO RFP#04282014B Due 5/6/2014 @ 2PM.  10 Houses.
All Qualified contractors can bid.
Asbestos Survey Reports for HHF RFP#04282014B:
Part 1

Hardest Hit Funds RFP# 04172014A Due 4/25/2014 @ 2 PM.  24 Houses
 Asbestos Survey Reports for HHF RFP#04172014A:
Part 1    Part 2     Part 3

Hardest Hit Funds RFP# 04172014B Due 4/25/2014 @ 2 PM. 27 Houses
Asbestos Survey Reports for HHF RFP#04172014B:
Part 1    Part 2 

Hardest Hit Funds RFP# 04172014C Due 4/25/2014 @ 2PM. 28 Houses
Asbestos Survey Reports for HHF RFP#04172014C:
Part 1    Part 2    Part 3

Hardest Hit Funds RFP# 04172014D Due 4/25/2014 @ 2 PM.  28 Houses

Asbestos Survey Reports for HHF RFP#04172014D:
Part 1    Part 2    Part 3

Hardest Hit Funds RFP# 04142014A Due 4/22/2014 @ 2 PM.  24 Houses
Asbestos Survey Reports for HHF RFP#04142014A:
Part 1    Part 2   Part 3

Hardest Hit Funds RFP# 04142014B Due 4/22/2014 @ 2 PM.  22 Houses
Asbestos Survey Reports for HHF RFP#04142014B:
Part 1    Part 2

Hardest Hit Funds RFP# 04142014C Due 4/22/2014 @ 2 PM.  10 Houses
Asbestos Survey Reports for HHF RFP#04142014C:
Part 1

Hardest Hit Funds RFP# 04142014D Due 4/22/2014 @ 2 PM.  36 Houses
Asbestos Survey Reports for HHF RFP#04142014D:
Part 1     Part 2    Part 3    Part 4    Part 5

Hardest Hit Funds RFP# 04142014E Due 4/22/2014 @ 2 PM. 30 Houses
Asbestos Survey Reports for HHF RFP#04142014D:
Part 1

Hardest Hit Funds RFP#03172014A Due 3/25/2014 @ 2 PM.  21 Houses
Asbestos Survey Reports for HHF RFP#03172014A:
Part 1    Part 2    Part 3    Part 4

Hardest Hit Funds RFP#03172014B Due 3/25/2014 @ 2 PM.  15 Houses
Asbestos Survey Reports for HHF RFP#03172014B:
Part 1

Hardest Hit Funds RFP#03172014C Due 3/25/2014 @ 2 PM.  18 Houses
 Asbestos Survey Reports for HHF RFP#03172014C:
Part 1

Hardest Hit Funds RFP#HHF03102014A Due 3/18/2014 @ 2PM.  20 Houses
Asbestos Survey Reports for HHF RFP#03102014A:
Part 1    Part 2    Part 3    Part 4 Part 5
Hardest Hit Funds RFP#03102014B Due 3/18/2014 @ 2PM. 24 Houses
Asbestos Survey Reports for HHF RFP#03102014B:
Part 1    Part 2
 Hardest Hit Funds RFP#03102014C Due 3/18/2014 @ 2 PM.  16 Houses
Asbestos Survey Reports for HHF RFP#03102014C:
Part 1    Part 2
#4 - Hardest Hit Funds RFP#03102014D Due 3/18/2014 @ 2 PM. 16 Houses 
Asbestos Survey Reports for HHF RFP#03102014D:
Part 1    Part 2    Part 3
Hardest Hit Funds RFP#03102014E Due 3/18/2014 @ 2 PM.  19 Houses
Asbestos Survey Reports for HHF RFP#03102014E:
Part 1
Hardest Hit Funds RFP#03102014F Due 3/18/2014 @ 2 PM.  21 Houses
Asbestos Survey Reports for HHF RFP#03102014F:
Part 1    Part 2
Hardest Hit Funds RFP#03132013A Due 3/20/2014 @ 2 PM.  15
Houses

Asbestos Survey Reports for HHF RFP#03132014A:
Part 1    Part 2    Part 3    Part 4
Part 5    Part 6    Part 7    Part 8
Hardest Hit Funds RFP#03132014B Due 3/20/2014 @ 2 PM.  17 Houses
 Asbestos Survey Reports for HHF RFP#03132014B:
Part 1    Part 2    Part 3    Part 4
part 5    Part 6    Part 7    Part 8
Hardest Hit Funds RFP#03132014C Due 3/20/2014 @ 2 PM.  31
Houses

Asbestos Survey Reports for HHF RFP#03132014C:
Part 1    Part 2
 Hardest Hit Funds RFP#03132014D Due 3/20/2014 @ 2 PM. 29
Houses

Asbestos Survey Reports for HHF RFP#03132014D:
part 1    Part 2
Hardest Hit Funds RFP#03132014E Due 3/20/2014 @ 2 PM. 31
Houses

Asbestos Survey Reports for HHF RFP#03132014E:
Part 1    Part 2
Detroit Demolition RFP#02182014A Due 2/25/2014 @ 2PM. 4 houses.
Asbestos Surveys for RFP#02182014A 

Detroit Demolition RFP#01072014B Due 1/15/2014 @ 2PM.  15 Houses.
Asbestos Surveys for RFP#01072014B:
Part 1
Part 2
Asbestos Survey for 15326 Greenlawn
 
Detroit Demolition RFP01072014A Due 1/15/2014 @ 2PM.  5 Houses.
Asbestos Surveys for RFP#01072014A.
Asbestos Survey for 8145 Orchard

Detroit Demolition RFP#12182013C Due 12/26/2013 @ 2PM. 11 Houses
Asbestos Survey Reports for RFP#12222013C
 Asbestos Survey report for 14231 Trinity

Detroit Demolition RFP#12182013B Due 12/26/2013 @ 2PM. 20 Houses.
Asbestos Survey Reports for RFP#12222013B:
Part 1 Part 2

Detroit Demolition RFP#12182013A Due 12/26/2013 @ 2PM. 20 Houses.
Asbestos Survey Reports for RFP#12222013A:
Part 1 Part 2 Part 3

Pontiac Demolition RFP#12122013A Due 12/19/2013 @ 2PM. 20 Houses.
Asbestos Survey Reports for RFP#12122013A.

Detroit Demolition RFP#12092013C Due 12/16/2013 @ 2PM. 12 Houses.
Asbestos Survey Reports for RFP#12092013C:
Part 1 Part 2

Detroit Demolition RFP#12092013A Due 12/16/2013 @ 2PM. 21 Houses.
Asbestos Survey Reports for RFP#12092013A:
Part 1 Part 2

Detroit Demolition RFP#12092013B Due 12/16/2013 @ 2PM. 20 Houses.

Asbestos Survey Reports for RFP#12092013B:
Part 1 Part 2 Part 3

Detroit Demolition RFP#12032013A Due 12/10/2013 @ 2PM. 15 Houses.
Asbestos Survey Reports for RFP#12032013A:

Detroit Demolition RFP#12020213B Due 12/9/2013 @ 2 PM. 27 Houses.
Asbestos Survey Reports for RFP#12022013A:
Part 1 Part 2 Part 3
14014 Kentfield
12121 W Outer Drive

Detroit Demolition RFP#12022013A Due 12/9/2013 @ 2 PM. 20 Houses
Asbestos Survey Reports for RFP#12022013A:
Part 1 Part 2
14100 Heydon
14054 Heydon

Detroit / Warren Demolition for Bank Properties RFP#12022013C Due 12/6/2013 @ 2PM. 18 Properties Detroit / Warren.

Asbestos Survey Reports for RFP#12022013C:

part 1 Part 2
Part 3 Part 4
Part 5 Part 6
Part 7 Part 8
Part 9 Part 10
Part 11

Detroit Demolition RFP#11222013B Due 12/2/2013 @ 2 PM. 21 Houses.
Asbestos Survey reports for RFP#11222013B.

Part 1 Part 2

Detroit Demolition RFP#11222013A Due 12/2/2013 @ 2 pm. 22 houses
Asbestos Survey reports for RFP#11222013A.

Part 1 Part 2

#1 Detroit Demolition RFP#11132013A Due 11/15/2013 @ 10am. 1 Emergency structure. This bid will be posted for 24 hours.

#1 - HHF Asbestos & Hazardous Survey RFQ Due 10/24/2013 @ 2pm.

#2 - HHF Demolition and Asbestos Abatement RFQ Due 10/24/2013 @ 2pm.

Newaygo & White Cloud Demolition RFP#09152013A Due 9/30/2013 @ 2pm. 7 Structures.

Detroit / Hazel Park / Ferndale Demolition RFP #09082013A Due 9/13/2013 @ 2PM. 13 houses.
Asbestos Surveys for RFP#09082013A:

Part 1 Part 2 Part3 Part 4 Part 5
Part 6

Leelanau Demolition
. Pre Bid Meeting scheduled for Wednesday September 11, 2013 @ 10am in Leelanau. Bid Due 9/16/2013 @ 4PM. 2 structures.

3145 N West Bay Shore Drive

7665 S West Bay Shore Drive

Detroit Demolition RFP#08292013C Due 9/9/2013 @ 2PM. 29 Houses.
Asbestos Surveys for RFP#08292013C.
Part 1
Part 2
Detroit Demolition RFP#08292013B Due 9/9/2013 @ 2PM. 25 Houses.
Asbestos Survey Reports for RFP#08292013B.
Part 1 Part 2 Part 3 Part 4
Detroit Demolition RFP#08292013A Due 9/9/2013 @ 2PM. 11 Houses.
Asbestos Survey Reports for RFP#08292013A.
Part 1
Part 2
Part 3

Detroit Demolition RFP#08062013A Due 8/9/2013 @ 4PM. These are (25) 8/26/13 Press Event Houses.

Asbestos Surveys for RFP#08062013A
Revised surveys per RFI:
16148 Indiana 15492 Cloverlawn

Detroit Demolition RFP08082013A Due 8/9 @ 4pm. These are (2) houses added to the 8/26/13 Press Event.

City of Petoskey Demolition of (2) Structures. Due 8/21/2013 @ 2PM to City of Petoskey.

Houghton County Demolition RFP #07242013A Due 7/31/2013 @ 2pm - 2 structures.
Asbestos survey for RFP#07242013A

Pontiac Demolition RFP #07242013B Due 8/2/2013 @ 2 pm - 2 Commercial Structures.
Environmental Documentation Package for 339 Paddock
Environmental Documentation Package for 350 Sanford

Detroit Demolition RFP#07082013A Due 7/16/2013 @ 2pm. 20 Houses.
Asbestos Surveys for RFP#07082013A below:
Part 1 Part 3
Part 2

Detroit Demolition RFP#07082013B Due 7/16/2013 @ 2pm. 16 Houses.

Asbestos Surveys for RFP#07082013B below:
Part 1
Part 3 1474 McKinstry
Part 2

Pontiac Demolition RFP#07112013A Due 7/19/2013 @ 2pm. 30 Houses
Asbestos Surveys for RFP#07112013A
Part1
Part 2
Pontiac Demolition RFP#07112013B Due 7/19/2013 @ 2pm. 19 Houses

Asbestos Surveys for RFP#07112013B

Detroit Demolition RFP#07012013A Due 7/10/2013 @ 2pm. 39 Houses.
Asbestos Surveys for RFP#07012013A below:
Part 1 Part 3 Part 5

Part 2 Part 4 Part 6

Houghton County Demolition / City of Lake Linden Demolition RFP06202013A Due 7/5/2013 @ 2pm.

Brevort Demolition RFP#06142013A Due 6/28/2013 @ 2pm.

Detroit Demolition RFP#06242013A Due 7/1/2013 @ 2pm. Demolition of 13 structures around Cody, Gompers and Bethune Schools.

Asbestos Surveys for RFP#06242013A

Detroit Demolition RFP#06192013A Due 6/26/2013 @ 2pm. Demolition of 19 structures around Cody, Gompers and Bethune Schools.

Asbestos Surveys for RFP#06192013A

Detroit Demolition RFP#06112013A Due 6/19/2013 @ 2pm. Emergency Demolition of 16 Residential Structures around Gompers School.

Detroit Demolition RFP#05292013A Due 6/7/2013 @2PM. Note that 2646 Norman is deleted and does not require a response.

Asbestos Surveys for RFP#05292013A

Asbestos Survey 20046 Pinehurst

Asbestos Survey 19350 Ste

Detroit Demolition RFP#05292013B Due 6/7/2013 @ 2pm.

Asbestos Surveys for RFP#05292013B


Asbestos Survey 1925 Central

Pontiac Demolition RFP#05302013A Due 6/7/2013 @ 2PM.

Asbestos Survey Reports for RFP#05302013A

Pontiac Demolition FP#05162013A Due 5/24/2013 @2pm. 10 Houses.

Asbestos Surveys for RFP#05162013.

Detroit Demolition RFP#05012013A Due 5/8/2013 @ 2pm. 13 Houses.
Asbestos Surveys for RFP#05012013A:

Part 1
Part 2
Detroit Demolition RFP#05012013B Due 5/8/2013 @ 2PM. 15 Houses.

Asbestos Surveys for RFP#05012013B

East Tawas RFP For Demolition of a Gas Station via Blight Elimination 2013 Grant Funds. Due 5/8/2013 at East Tawas.

Demolition RFP#10282012A Due 11/5/2012 @ 2PM. closed

Asbestos Surveys for RFP#10282012A-part 1

Asbestos Surveys for RFP#10282012A-part 2

Demolition RFP#10282012B Due 11/5/2012 @2PM. Closed

Asbestos Surveys for RFP#10282012B

Demolition RFP#10082012A Due 10/15/2012 2 PM - Closed

Asbestos Survey Reports and Emergency Letters for Demolition RFP#10082012A - Closed

Asbestos Survey RFQ#9282012A - Closed.

Demolition RFP#10152012A Due 10/22/2012 @ 2pm. closed

Asbestos Surveys for Demolition RFP#10152012A. Closed

Demolition RFP#10152012B Due 10/22/12 @ 2pm. Closed

Demolition RFP#11052012A Due 11/13/2012 @2PM. Closed

Asbestos Surveys for RFP#11052012A.

Demolition RFP#11052012B Due 11/13/2012 @2PM. Closed

Emergency Letters for RFP#11052012B

Demolition RFP 11202012A Due 11/28/2012 @ 2PM - Closed

Asbestos Surveys for RFP 11202012A

Demolition RFP 11202012B Due 11/28/2012 @ 2pm - Closed

Asbestos Surveys for RFP 11202012B

Asbestos Surveys for missing 2 Norman properties as indicated for RFP 11202012B.

Demolition RFP 11202012C Due 11/28/2012 @ 2pm - Closed

Asbestos Surveys for RFP 11202012C

Demolition RFP 11202012D Due 11/28/2012 @ 2pm - Closed

Asbestos Surveys for RFP 1120201D

Demolition RFP# 01232013A Due 1/30/2013 @ 2 PM. Click Here

Asbestos Surveys for Demolition RFP 01232013A

Demolition RFP # 01232013B Due 1/30/2013 @ 2PM. Click Here

Asbestos Surveys for Demolition RFP 01232013B

Demolition RFP# 01232013C Due 1/30/2013 @ 2 PM. Click Here.


Asbestos Surveys for Demolition RFP 01232013C
Demolition RFP #02252013A Due 3/5/13
@ 2 PM. Click Here.


Asbestos surveys for RFP #02252013A

Demolition RFP #02252013B Due 3/5/13
@ 2 PM. Click Here.

Asbestos surveys for RFP #02252013B

Demolition RFP #02252013C Due 3/5/13
@ 2 PM. Click Here.

Asbestos surveys for RFP #02252013C






RFI - ALL Demolition RFP

Q1- Where are the Asbestos Surveys for  684 Savannnah, 19153 Cardoni and 20101 Keaton for RFP#09292014A?

A1.  Under asb survey part 3, Part 1 and part 2 respectively.

Q2. RFP's 09292014A, 09302014A and 10012014A Appear to be missing signature pages.

A2. Incorrect.

Q3. ASB Survey for 18926 Braile has wrong address for RFP10012014B.

A3. Incorrect.  ASb Survey is located under part 5.

Q4. For RFP09292014A besides meeting minimum qualifications in the RFP does the Bidder need to be prequalified to participate?

A4. RFP solicitation states open to all that meet minimum qualifications.  Please refer to RFP documents.

Q5. For RFP 09292014A do the houses require abatement or will they be treated as emergency demolitions and if they require abatement where will the asbestos surveys be found?

A5. RFP provides all information as part of scope and description.  Asbestos surveys are located under the RFP documents below the link that states "Asbestos survey reports" broken in to downloadable PDF's.  Ensure you have the free Adobe reader or other PDF reader software to view.

Q6. Have all utility disconnects already been obtained for each location?

A6.  Per RFP scope, utility disconnect are to be provided to winning bidder.  Please refer to RFP documents.


Q7.  For RFP#10232014A there is mention of 11 properties that were inspected and determined to have no ACM and will be third party verified to ensure no regulatory issues.  Do these properties need to be abated?  Will surveys be provided?

A7. Properties do not need to be abated as they contain no ACM.  Yes surveys have been posted.





RFI - Hardest Hit Funds Procurement

Q1. Can you publish a list of attendees from the Pre Bid Meeting?

A1. Yes.

Click here for Asbestos Survey attendees.

Click here for Demolition attendees.

Q2. My firm has a certificates of good standing from 2012. D I need to provide documents with more current dates?

A2. Documentation submitted for the RFQ must be current and can not expire during the review process or thru January 2014 at a minimum.

Q3. Will performance bonds be required for Asbestos Survey Contractors?

A3. No. Performance Bonds will only be required for Demolition and Abatement Contractors.

Q4. Could you please advise off what you are looking for in regards to proof of meeting minimum qualifications and proof of past performance?

A4. Contractor is to address via creation of "Proof of Meeting Minimum Qualifications, Capacity and Statement of Qualifications" narrative as requested in RFQ. Minimum Qualifications are listed in RFQ under Section 2.

Q5. On RFQ #09302013B there seems to be a slight discrepancy between the requirements to demonstrate experience and capacity asked for in Section 2, pages 4 and 5, and Section 7, part 2, page 17, which should be followed?

A5. We see no discrepancy. Please specifically state what you are referring.

Q6. Are the Conflict of Interest Statement and the Debarment and Suspension Affidavit to be written by us or do you want to provide a form/document for us to complete?

A6. Both are simple documents written by your organization. The documents can consist of the language contained in the RFQ copied onto letterhead, properly titled, confirmed and signed by an authorized company representative.

Q7. We are attempting to secure Class B demolition license prior to submitting our RFQ response but will not have the process completed by the due date. Will we be excluded?

A7. No. The RFQ makes provisions for already possessing or in process of application for the license. Further, as long as the entity is licensed via the RFQ minimum guidelines with the State there will be no issue with exclusion. Finally, temporary Class B Detroit wrecking licenses will be issued upon award of work for those not currently so certified.

Q8. We are an Accounting firm representing several clients and are reluctant to provide a letter to attest to proof of financial stability. Is there a letter format or other option that would be acceptable?

A8. No. We require the requested confirmation to ensure that the company bidding has the financial stability and capacity to execute the requirements of the program. There is no required letter format, simply a statement attesting to the RFQ request on CPA letterhead signed by an authorized representative of the company who reviewed the Bidders financial data.

Q9. Is there an end date to "Open Enrollment"?

A9. Not at present.

Q10. If a company has already submitted and has been added to the contractor pool, do they need to do anything during the Open Enrollment Period?

A10. No.

Q11. When will contractors be informed they meet qualifications during the open enrollment period?

A11. The committee will meet regularly to review applications. We envision 14 days for feedback.

Q12. How will qualified contractors receive projects?

A12. Contractors will be assigned NTP's for asbestos survey and will respond to RFP's for demolition work per the program outline.

Q13. On Pages 20,21 & 24 there are references to Owner / Developer and Name of General Contractor. What do we put on those lines?

A13.  The name of the respondent organization - they can be the same. 

Q14. Is there a template form for proof of past performance or are respondents free to submit responses including reference letters from past clients?

A14. Respondents are free to reply in any format.






Bid Tabulation Results:

HHF Detroit Demolition:

Demolition RFP#03102014A Bid Tabulation

Demolition RFP#03102014B Bid Tabulation

Demolition RFP#03102014C Bid Tabulation

Demolition RFP#03102014D Bid Tabulation

Demolition RFP#03102014E Bid Tabulation

Demolition RFP#03102014F Bid Tabulation

Demolition RFP#03132014A Bid Tabulation

Demolition RFP#03132014B Bid Tabulation

Demolition RFP#03132014C Bid Tabulation

Demolition RFP#03132014D Bid 
Tabulation


Demolition RFP#03132014E Bid Tabulation

Demolition RFP#03172014A Bid Tabulation

Demolition RFP#03172014B Bid Tabulation

Demolition RFP#03172014C Bid Tabulation

Demolition RFP#04142014A Tabulation

Demolition RFP#04142014B Tabulation

Demolition RFP#04142014C Tabulation


Demolition RFP#04142014D Tabulation

Demolition RFP#04142014E Tabulation

Demolition RFP#04172014A Tabulation

Demolition RFP#04172014B Tabulation

Demolition RFP#04172014C Tabulation

Demolition RFP#04172014D Tabulation

Demolition RFP#04282014A Tabulation

Demolition RFP#05052014A Tabulation

Demolition RFP#05052014B Tabulation

Demolition RFP#05052014C Tabulation

Demolition RFP#05082014A Tabulation

Demolition RFP#05082014B Tabulation

Demolition RFP#05122014A Tabulation

Demolition RFP#05122014B Tabulation

Demolition RFP#05122014C Tabulation

Demolition RFP#05122014D Tabulation

Demolition RFP#05152014A Tabulation

Demolition RFP#05152014B Tabulation

Demolition RFP#05152014C Tabulation

Demolition RFP#05192014A Tabulation

Demolition RFP#05192014B Tabulation

Demolition RFP#05292014A Tabulation

Demolition RFP#05292014B Tabulation

Demolition RFP#05292014C Tabulation

Demolition RFP#06022014C Tabulation

Demolition RFP#DECON7A Tabulation

Demolition RFQ#06172014A Tabulation

Demolition RFP#07182014A Tabulation

Demolition RFP#07182014B Tabulation

Demolition RFP#07212014C Tabulation

Demolition RFP#07212014D Tabulation

Demolition RFP#08282014B Tabulation

Demolition RFP#08292014A Tabulation

Demolition RFP#09052014A Tabulation

Demolition RFP#09102014A Tabulation

Demolition RFP#09302014A Tabulation

Demolition RFP#10012014A Tabulation




HHF Pontiac Demolition:

Asbestos RFQ Bid Tabulation

Demo and Abate RFQ Bid Tabulation

Demolition RFP#08192014C Bid Tabulation

Demolition RFP#08192014D Bid Tabulation

Demolition RFP#01282014A Bid Tabulation

MLB Demolition:

Asbestos RFQ Bid Tabulation


Detroit:

Demolition RFP #10082012A Bid Tabulation

Demolition RFP #10152012A Bid Tabulation

Demolition RFP #10152012B Bid Tabulation

Demolition RFP #10282012A Bid Tabulation

Demolition RFP #10282012B Bid Tabulation

Demolition RFP #11052012A Bid Tabulation

Demolition RFP #11052012B Bid Tabulation

Demolition RFP #11202012A Bid Tabulation

Demolition RFP #11202012B Bid Tabulation

Demolition RFP #11202012C Bid Tabulation

Demolition RFP #11202012D Bid Tabulation

Demolition RFP #12052012A Bid Tabulation

Demolition RFP #12052012B Bid Tabulation

Demolition RFP#12052012A Bid Tabulation

Demolition RFP#12052012B Bid Tabulation

Demolition RFP #12052012C Bid Tabulation

Demolition RFP #0225113A Bid Tabulation

Demolition RFP #022513B Bid Tabulation

Demolition RFP #022513C Bid Tabulation

Demolition RFP#04202013A Bid Tabulation

Demolition RFP#04202013B Bid Tabulation

Demolition RFP#05012013A Bid Tabulation

Demolition RFP#05012013B Bid Tabulation

Demolition RFP#05292013A Bid Tabulation

Demolition RFP#05292013B Bid Tabulation

Demolition RFP#06192013A Bid Tabulation

Demolition RFP#06242013A Bid Tabulation

Demolition RFP#06112013A Bid Tabulation

Demolition RFP#07012013A Bid Tabulation

Demolition RFP#07082013B Bid Tabulation

Demolition RFP#07082013A Bid Tabulation



Demolition RFP#08062013A Bid Tabulation


Demolition RFP#08082013A Bid Tabulation

Demolition RFP#08292013A Bid Tabulation

Demolition RFP#08292013B Bid Tabulation


Demolition RFP#08292013C Bid Tabulation


Demolition RFP#11222013A Bid Tabulation

Demolition RFP#11222013B Bid Tabulation

Demolition RFP#12022013A Bid Tabulation

Demolition RFP#12022013B Bid Tabulation

Demolition RFP#12032013B Bid Tabulation

Demolition RFP#12092013A Bid Tabulation

Demolition RFP#12092013B Bid Tabulation

Demolition RFP#12092013C Bid Tabulation


Demolition RFP#12182013A Bid Tabulation

Demolition RFP#12182013B Bid Tabulation

Demolition RFP#12182013C Bid Tabulation

Demolition RFP#07212014A Bid Tabulation


Demolition RFP#07212014B Bid Tabulation


Demolition RFP#08192014A Bid Tabulation

Demolition RFP#08192014B Bid Tabulation




Pontiac Demolition RFP#05162013A Bid Tabulation

Pontiac Demolition RFP#05302013A Bid Tabulation

Pontiac Demolition RFP#07112013A Bid Tabulation

Pontiac Demolition RFP#07112013B Bid Tabulation

Pontiac Demolition RFP#07242013B Bid Tabulation



Brevort Demolition RFP#06142013A Bid Tabulation



Coldwater Demolition RFP#06102013A Bid Tabulation


Houghton Demolition RFP#07242013A Bid Tabulation


NCCS Demolition RFP#09152013A Bid Tabulation



BOA RFP#09082013A Bid Tabulation
BOA RFP#12022013A Bid Tabulation
BOA RFP#01072014A Bid Tabulation
BOA RFP#02182014A Bid Tabulation


 
 
Contractor Work In Process (WIP) Report to be submitted to MLB every Monday / Wednesday / Friday by 5PM.  Standard report format is attached below:

WIP Report Template

Contact ADR Consultants directly with Questions: barryse@adrllc.net